Quick Start Guide
Installation, Operation, Commissioning and Maintenance
DC Power Supply System
Integrated Applications
Mini
stem
356808.103
Miscellaneous
Communication
o CAN Bus Termination (13)
o Installing PowerSuite – PC software (13)
AC Mains
o Mains Feeds versus Rectifier ID (14)
o Plug-and-Play Rectifiers versus Mains Monitoring (14)
Battery Monitoring
o Battery Symmetry – Connections (15)
o Battery Interface Card ~ Terminals & Pin-out, ( 16)
Alarms & Monitoring
o Standard Alarm Relays & Digital Inputs (17)
o Alarm Interface Card ~ Terminals & Pin-out (17)
o Alarm Interface Card, Extd. ~ Terminals & Pin-out (18)
Internal Connections
o System Interface Card ~ Terminals & Pin-out (19)
o LVD Latching Contactors (19)
Drawings
o Block Diagram Minipack 48VDC, 3.2kW (21)
o Block Diagram Minipack 48VDC, 4.8kW (22)
Introduction
o The Smartpack based Product Range (2 )
o Brief System Description ⎯ Minipack (2 )
Installation
o Installing Smartpack and Rectifier Modules ( 3)
o Installation and Maintenance Details
⎯ Opening or Closing the Minipack Drawer Shelf (4)
⎯ Mounting or Removing Minipack Blind Covers (4)
⎯ Removing or Mounting Load MCBs (5)
⎯ Configuring Priority and Non-Priority Load Circuits (5)
o Installation steps; mechanical, electrical (6-7)
o Location of Components, GA drawing; 6 and 4 rectifiers systems (8)
o Connections, Factory Settings, etc. (9)
Commissioning
o Pre-start check (10 )
o Commissioning steps, Startup (10-11)
Operation
o Front keys and display (12)
o Software Menus (12)
Check Lists
pullout forms
o Installation Check List
o Circuit Distribution List
o Commissioning Procedure
o Maintenance Procedure