1 Wireless planning
1.1 Power up sequence
The gateway should be installed and functioning properly before power
modules are installed in any wireless field devices. Wireless field devices
should also be powered up in order of proximity from the gateway
beginning with the closest. This will result in a simpler and faster network
installation.
1.2 Gateway redundancy
If the wireless gateway was ordered with redundancy (Gateway Redundancy
code RD), refer to Appendix D in the Emerson Wireless 1420 Gateway
Reference Manual for additional installation instructions.
1.3 Gateway firmware compatability
The gateway firmware needs to be compatible with host connections being
made. Verify that gateway firmware and host firmware (e.g. Security Setup
Utility (SSU) and Plantweb Insight) are compatible before commissioning.