EasyManua.ls Logo

Emerson Dixell IEV24D - Page 47

Emerson Dixell IEV24D
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1592026260 IEV22-24D GB r.1.0 21.02.2019 IEV 47/60
Et 43
Holding time of Et4 steps at the start-up of the
regulation in heat pump
1
250
Sec
Et 44
Interval of updating the valve output in heat
pump mode
0
120
Sec
Et 45
Interval time for valve opening when a probe is
damaged in heat pump mode
0
250
Sec
Et 46
Valve opening percentage when a probe is
damaged in heat pump mode
0
100
%
MOP / LOP alarm
Et 47
Low pressure alarm activation delay (LOP)
0
250
Sec
Et 48
High pressure alarm activation delay (MOP)
0
250
Sec
Et 49
High overheating alarm activation delay
0
250
Sec
10 Sec
Et 50
Low overheating alarm activation delay
0
250
Sec
10 Sec
Defrost
Et 51
PID proportional component in defrost
0.0
0
50.0
122
°C
°F
dec
Int
Et 52
Number of steps the valve 1 has to move
before compressor start-up.
For unipolar valves refer to the notes included
in paragraph 7.3.
Ec14
Ec13
Full steps
Et 53
Holding time of Et52 steps at the start-up of the
defrost (valve 1)
0
250
Sec
Et 54
Number of steps the valve 2 has to move
before compressor start-up.
For unipolar valves refer to the notes included
in paragraph 7.3.
Ec23
Ec22
Full steps
Et 55
Holding time of Et52 steps at the start-up of the
defrost (valve 2)
0
250
Sec
PID saturation
Et 56
Increase or decrease opening percentage
when the PID is saturated in cooling mode
0.1
5.0
%
Et 57
Increase or decrease opening percentage
when the PID is saturated in heating mode
0.1
5.0
%
Et 58
Increase or decrease opening percentage
when the PID is saturated in defrost
0.1
5.0
%

Related product manuals