EasyManua.ls Logo

Emerson ELQ 100 - Connecting Control Signals; Connecting Open and Close Control Signals

Emerson ELQ 100
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TM
11
Installation Operation & Maintenance manual ELQ
DOC.55.EDN Rev: E
October 2012
1
10
8
7
5
6
4
3
2
9
20
19
18
17
15
16
14
13
12
26
37
36
33
32
30
31
2928
27
34
25
22
24
23
21
35
11
TX
24 V DC
+
-
5 CONNECTING CONTROL SIGNALS
TheELQ-actuatorhasaterminalcompartmentwitha
plugconnectorforcontrolsignals.
Allcontrolsignalscanbeconnectedtotheterminals
insidethiscompartment.Incaseofmaintenanceor
replacementofthevalve/actuatorunit,theterminal
compartmentcanbeunpluggedfromtheELQ-actu-
atorandpluggedintoanotheractuator.Youdonot
needtoreconnectallthecontrolwiring.
Note
- Beforeconnectingthepowersupplyconnect
alloptionsproperly(seeoptioninstructions).
- Useandmountcableglandsasrequiredby
nationalorlocallegislation.
- WhenIP65,IP67orNEMA4Xingressprotec-
tionisrequired,theelectricalentriesmustbe
ttedwithequivalentorhigherratedglands
orblindplugs.
ATEX Installation instructions
Seechapter1.2and1.3foruseofFlame-
proofELQactuatorsinATEXclassied
hazardousareas.
Warning
Terminalcompartmentmustbeelectronically
isolatedbeforeanydisassemblyisbegun.
5.1 Connecting “Open” and “Close” con-
trol signals
A24VDCsignalat1and3openstheactuator.A
signalat2and3closestheactuator.
Nosignal(orasignalatboth),theactuatorstops.
5.01 Terminal compartment
close open
5.1.1 Connecting “Open” and “Close” control signals

Related product manuals