3
___________________________________RAH / PAH Ka_________________________________
4.2 Preliminary checks 34
4.3 Start up 35
4.3.2 Winter Stop 36
4.3.3 Switching off 36
4.4 Microprocessor regulation 36
5. MAINTENANCE 37
5.1 Programmed Maintenance 37
5.1.1 Leak detection 38
5.1.2 Safety pressure switches check 38
5.1.3 Safety valves check 38
5.1.4 Fluid to be cooled check 38
5.1.5 Noise and Vibration check 38
5.2 Ordinary Maintenance 39
5.2.1 Overcurrent protections device check 39
5.2.2 Contactors checks 39
5.3 Troubleshooting 41
5.4 Extraordinary Maintenance 42
6. DEMOLITION AND DISPOSAL 43