Setting Up the Enterasys Matrix N7 Chassis
Enterasys Matrix N7 Chassis Setup 3-7
3.2.3 Rack Mounting the Enterasys Matrix N7 Chassis
The N7 chassis can be mounted in a standard 48.26-centimeter (19-inch) equipment rack. To rack
mount the chassis into a rack you need to
allow at least 60 centimeters (24 inches) of clearance in front of the rack for chassis installation,
install the shelf into the rack first, then
install the N7 chassis into the rack.
Note: In order to prevent a possible interference between the rack frame front and
chassis rack ears, the tapped rails may need to be adjusted such that they are recessed
approximately 2 inches behind the rack frame front. If the rack has a front door, this
distance may need to be slightly more depending on the door thickness.