EasyManuals Logo

Enviro HL SERIES User Manual

Enviro HL SERIES
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
ENVIRO-TEC
27
FORM ET115.24-NOM11 (118)
RECEIVING & INSPECTION
q
Unit received undamaged
q
Unit received complete as ordered
q
Unit arrangement/hand correct
q
Unit structural support complete & correct
HANDLING & INSTALLATION
q
Unit mounted level & square
q
Proper access provided for unit & accessories
q
Proper electrical service provided
q
Proper overcurrent protection provided
q
Proper service switch/disconnect provided
q
Proper hot water line to unit
q
Proper chilled water line size to unit
q
Proper steam line sizes to unit
q
Proper refrigerant line sizes to unit
q
Proper steam supply pressure to unit (15psi max)
q
Proper steam condensate trap on return line
q
All shipping screws & braces removed
q
All services to unit in code compliance
COOLING/HEATING CONNECTIONS
q
Protect Valve Package Components From Heat
q
Mount valve packages
q
Connect Field Piping To Unit
q
Pressure test all piping for leaks
q
Install Drain Line & Traps As Required
q
Insulate all piping as required
q
Install Condensate Pan under Piping as Required
DUCTWORK CONNECTIONS
q
Install Ductwork, Fittings & Grilles As Required
q
Proper supply & return grille type & size used
q
Control Outside Air For Freeze Protection
q
Insulate all ductwork as required
ELECTRICAL CONNECTIONS
q
Refer to unit wiring diagram
q
Connect incoming power service or services
q
All eld wiring in code compliance
UNIT STARTUP
q
General visual unit & system inspection
q
Record electrical supply voltage
q
Record ambient temperature
q
Check all wiring for secure connections
q
Close all unit isolation valves
q
Flush water systems
q
Fill systems with water/refrigerant
q
Vent water systems as required
q
All ductwork & grilles in place
q
All unit panels & lters in place
q
Start fans, etc.
q
Check for overload condition of all units
q
Check all ductwork & units for air leaks
q
Balance air systems as required
q
Record all nal settings for future use
q
Check piping & ductwork for vibration
q
Check all dampers for proper operation
q
Verify proper cooling operation
q
Verify proper heating operation
q
Reinstall all covers & access panels
SECTION FOUR - INSPECTION & START-UP CHECKLIST

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Enviro HL SERIES and is the answer not in the manual?

Enviro HL SERIES Specifications

General IconGeneral
BrandEnviro
ModelHL SERIES
CategoryFan
LanguageEnglish

Related product manuals