EasyManua.ls Logo

Epson Stylus Office T1100 - Page 121

Epson Stylus Office T1100
163 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WorkForce 1100/Epson Stylus Office T1110/B1100/T1100/Epson ME Office 1100 Revision A
Disassembly And Assembly Removing the Motors 121
Confidential
6. .Press the Driven Pulley toward the center to loosen the CR Drive Belt, and
remove the CR Drive Belt from the CR Motor Pinion Gear.
Figure 4-149. Removing the CR Motor
7. Remove the two C.B. M3 x 4 screws that secure the CR Motor, and remove the CR
Motor from the Main Frame.
Figure 4-150. Removing the CR Motor
CR Drive Belt
Driven Pulley
CR Motor Pinion Gear
2
1
19) C.B. M3x4
(4±0.5 kgf.cm)
Make the Lot No. printed surface on the CR Motor face the
direction shown in the figure below.
Figure 4-151. Reinstalling the CR Motor
Tighten the screws in the order shown in Figure 4-150
A D J U S T M E N T
R E Q U I R E D
After replacing the CR Motor, always make the required adjustments
referring to the following.
“Chapter 5 Adjustment (p.128)
Lot No. Printed Surface
www.printerwhy.net
高速行式打印机 http://www.lineprinter.com.cn/
_______________________________________________________________________________________
_______________________________________________________________________________________
打印机维修论坛 http://www.printerwhy.net/ 打印机驱动下载 http://www.printerwhy.com/

Table of Contents

Related product manuals