WorkForce 1100/Epson Stylus Office T1110/B1100/T1100/Epson ME Office 1100 Revision A
Disassembly And Assembly Disassembling the Printer Mechanism 89
Confidential
5. Remove the two C.B.S. M3 x 6 screws that secure the Frame Support Plate (Left), 
and remove it.
Figure 4-58. Removing the Left Frame Support Plate
6. Remove the foot of Left PG Torsion Spring from tab A, and remove the coil 
section from tab B to remove Left PG Torsion Spring from the Main Frame.
Figure 4-59. Removing the Left PG Torsion Spring
7. Remove the foot of Right PG Torsion Spring from tab A, and remove the coil 
section from tab B to remove the Right PG Torsion Spring from the Main Frame.
Figure 4-60. Removing the Right PG Torsion Spring
 Insert the Left Frame Support Plate into the notch on the Main 
Frame. See Figure 4-58 (p.89)
 Align the two tabs on the Main Frame and the tab on the Paper 
EJ Frame Assy with the three positioning holes on the Frame 
Support Plate (Left). See Figure 4-58 (p.89)
Align the tab (rear side) of the Left Frame Support Plate with the 
outside of the Left CR Shaft Mounting Plate. See Figure 4-58 
(p.89)
 Tighten the screws in the order shown in Figure 4-58
1
2
2) C.B.S. M3x6
(8±1 kgf.cm)
Tab
Tabs
Left Frame Support Plate
Paper EJ Frame Assy
Notch
Left PG Torsion Spring
Tab A
Tab B
Right PG Torsion Spring
Tab A
Tab B
                     高速行式打印机 http://www.lineprinter.com.cn/                      
_______________________________________________________________________________________ 
_______________________________________________________________________________________ 
打印机维修论坛 http://www.printerwhy.net/     打印机驱动下载 http://www.printerwhy.com/