2. MEASUREMENT FLOW
Procedure Process Reference section Relevant section
1
Prepare for measurement
6.3.1
2
Power distribution
6.3.2
3
Ask an examinee to ready for a
measurement
6.3.4
6.4 Setting of etup screen
7.2 Fuse replacement
7.3 Setting of chinrest liner
4
Alignment
6.3.5 8 Tip for effective measurement
5
Take a measurement
6.3.6 9 Error display
6
Print out the measurement result
6.3.7 7.1 Reload of printer paper
7
Switch right/left eye of the examinee
OR switch the examinee
Go to the procedure 3
8 Storage of the device 7.4
This device has the auto/manual measurement switch function. In case of the auto measurement, the
measurement is started automatically after alignment is achieved. In case of the manual measurement, on
the other hand, the measurement is started by pressing the measurement start switch.
The measurement can be started manually by pressing the measurement start switch even
when the setting of Start is either “Auto” or “Auto-Quick”.