4. Installation instructions
4.1. Prepare for installation
4.1.1. Plan for installation
The following recommendations are a guide to help you plan the installation of the charging station.
Choose location
Position the charging station, where possible, in a location where it is not exposed to sunlight and
vulnerable to external damage.
The wall must have a flat structure and must be able to hold a load of at least 100 kg.
The minimum free space around the charging station is 300 mm.
The location must allow the charging cable to remain within its bending tolerance.
Note:
The above illustration indicates a standard installation height. Observe and comply with the local
accessibility regulations.
Pre-installation checklist
The local installation regulations are identified and are followed.
All necessary permits are obtained from the local authority that has jurisdiction.
The existing electrical load has been calculated to find the maximum operating current for the
charging station installation.
A miniature circuit breaker (MCB) and residual current device (RCD) are installed upstream and
have ratings that correspond to the local power supply as well as to the required charging power.
All cables match the specifications for the charging station that you are going to install.
The correct specification of power supply cable has been routed to the installation area, and there