Electronic Controllers for Reverse Osmosis Plants
Instruction Manual
OS 3030
Software version 2.01

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the EWS OS 3030 and is the answer not in the manual?

EWS OS 3030 Specifications

General IconGeneral
BrandEWS
ModelOS 3030
CategoryController
LanguageEnglish

Summary

Phase Operations and Measurements

Conductivity Measurement Function

Details conductivity measurement capabilities and ranges.

Manual Control Operations

Starting Production Phase

Procedure to manually start the production phase using the ON button.

Manual Control Procedures

Acknowledging Alarms

Process for cancelling alarms and their associated actions.

Alarm Signals

Conductivity Limit Alarms

Details alarms for minimum and maximum conductivity limits.

Pressure and Motor Protection Alarms

Describes exceeded pressure and motor circuit-breaker alarms.

System Alarm Signals

Low-Pressure Signal Alarms

Details the low-pressure alarms (1, 2, and 3) and their behavior.

Concentrate Signal Alarms

Describes the concentrate signal alarms (1, 2, and 3) and their effects.

Specific Alarm Signals

Permeate and External Switch Alarms

Alarms for rinse permeate and external alarm switch signals.

Reservoir Level and Power Alarms

Alarms for tank status, power failure, and stop signals.

Additional Output Functions

Dosing and Permeate Valve Control

Configuration for dosing and permeate valve operations.

Input Function Settings

Pressure and Flow Inputs

Configuration for excess pressure, low-pressure, and concentrate inputs.

Changing and Scanning the Basic Settings

General Programming Instructions

Guidelines for setting up and modifying controller parameters.

Basic Settings Configuration

Conductivity Meter Configuration

Configuration of conductivity meter parameters and limits.

Measurement Adjustment Settings

Manual Temperature Compensation

Adjusting conductivity readings based on water temperature.

Conductivity Correction Factor Application

Applying correction factors for accurate conductivity measurement.

Selecting Programmable Input Functions

Input 1 Function Selection

Choosing the function for Input 1.

Input 2 Function Selection

Choosing the function for Input 2.

Input Function Parameters

Input Function Parameters: Level Switches

Setting parameters for reservoir level switch inputs.

Input Function Parameters: Concentrate Control

Configuring parameters for concentrate flow monitoring.

Input Function Parameter Details

Input Function Parameters: Low-Water Pressure

Setting parameters for low-water pressure alarms and restarts.

Input Function Parameters: External Alarm Switch

Configuring parameters for the external alarm switch.

Input Function Parameter Management

Input Function Parameters: STOP Input

Defining behavior and phases for the stop input.

Input Function Parameters: Power Failure

Configuring system behavior during and after power failures.

Selecting Programmable Output Functions

Output 1 and Output 2 Function Selection

Assigning functions to OUT1 and OUT2 relay outputs.

Output Function Parameters

Output Function Parameters: Dosing Time

Setting the duration and timing for dosing pulses.

Output Function Parameters: Dosing ON;OFF

Configuring ON and OFF times for pulsed dosing.

Output Function Parameter Details

Output Function Parameters: Permeate Valve

Setting conductivity limits and delays for the permeate valve.

Output Function Parameters: Alarm Relay

Defining events that trigger the alarm relay.

Activating Buzzer Signals

Buzzer Activation Configuration

Setting events to trigger buzzer signals.

Production Phase Configuration

Production Phase Stage Timing

Setting the duration for production phase stages.

Production Phase Valve and Output Control

Defining valve states and output activation for production stages.

Phase Control Configurations

Stop During Alarm Phase Control

Defining the system phase when a fault occurs.

Standby Phase Configuration

Rinse After Production Phase Configuration

Rinse During Standby Phase Configuration

Rinse During Production Phase Configuration

Maintenance Phase Configuration

Stop During Maintenance Phase Configuration

Code Number Entry and Management

Installation and Start-up Procedures

Related product manuals