EasyManua.ls Logo

Extra 300/SC - 09-10-00 TOWING

Extra 300/SC
482 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 09
PAGE 3
MAINTENANCE MANUAL EXTRA 300/SC
PAGE DATE: 16. June 2008
09-00-00 GENERAL
This chapter describes the procedures and precautions
nescessary for proper ground handling of the EXTRA 300/SC.
09-10-00 TOWING
D A N G E R When preparing for ground handling operation ensure
that the ignition switch is off.
The aircraft should be moved on the ground by hand without
using a towing vehicle or tow bar. For moving the aircraft on
the ground, push by hand the wing leading edges or pull at the
inboard portion of the propeller blades.

Table of Contents

Related product manuals