EasyManuals Logo

Extreme Networks Virtual Services Platform 7200 Series User Manual

Extreme Networks Virtual Services Platform 7200 Series
81 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #70 background imageLoading...
Page #70 background image
Important notice about rack safety
One prerequisite to installing the switch in an equipment rack is to bolt the equipment rack to the
floor.
Warning:
If you pull the chassis all the way out on the slide rails, there is a danger of the rack tipping over
if the rack is not bolted to the floor. This can happen even if there are other devices installed in
your equipment rack.
Removing the switch from an equipment rack
Follow these steps if you have to remove the switch from an equipment rack.
Important:
This procedure requires two people.
Procedure
1. Disconnect the power cord from the switch.
2. Slide the switch out until the lock engages.
3. While the person standing in back of the chassis slides both of the white release locks (one
on each side of the chassis) towards the front, the person standing in front of the chassis
Installing the Virtual Services Platform 7200 Series
March 2020 Installing the VSP 7200 Series 70

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Extreme Networks Virtual Services Platform 7200 Series and is the answer not in the manual?

Extreme Networks Virtual Services Platform 7200 Series Specifications

General IconGeneral
BrandExtreme Networks
ModelVirtual Services Platform 7200 Series
CategorySwitch
LanguageEnglish

Related product manuals