A1400 AIR RDT 97 532119 04 - Rev. C
Translation of the original instructions
ENGLISH
19. MAINTENANCE
!
To maintain operating safety and efficiency conditions and reduce
faults and disservice, routine maintenance and periodic replacements
set out in 27 must be carried out.
ROUTINE MAINTENANCE must be performed every 6 months.
Frequency of replacements is indicated based on number of opera-
tion cycles for components subject to wear; in years for components
subject to deterioration.

The buzzer alerts to the need to perform replacements.
!
All maintenance operations must exclusively be performed by
technical-professional personnel.
Only the installer/maintenance technician is authorised to open the
casing to access the automation housing.
19.1 CALCULATION ESTIMATE OF CYCLES
PERFORMED
In the event of board fault E1400 RD with subsequent cycle counter
loss with error code 53, it is necessary to perform an estimate of
the number of cycles performed until then since the last servicing.
R1 = number of days elapsed since the last motor replacement (see
SYSTEM REGISTER)
R2 = number of hours of operation per day
R3 = door cycle time (opening time + pause + closing time)
!
The installer must take on responsibility for indicating parameters
R1, R2 and R3
Calculate:
R4 = R1 * R2 *3600
Calculate the ESTIMATED NUMBER OF CYCLES:
R4 / R3
After that from SDK EVO enter in menu 5 Cycle counter, section
Maintenance 94, the calculated value of cycles.
27 Maintenance and replacement programme
ROUTINE MAINTENANCE
OPERATION
Check automation fastening to the wall check the support profile is solidly secured to the wall
in case of installation with self-supporting Head Section:
check screws securing the support profile to the self-supporting profile and the screws
of side wall fixings
-
2130
Check fastening of Motor_1 and auxiliary Motor check screws securing the motors on the support profile
23
Check on carriages check screws securing to the leaf
check and adjust the counter wheels of carriages and leaf depth and height screws
33
34
Check mechanical stops check position of mechanical stops and fixing screws
46
Belt tensioning check check belt tensioning
44
Cleaning clean: Sliding Guide; Lower Guide Shoe; Carriages
100
Functional system check perform required checks and procedures to ensure integrity of the load bearing structure
and leaf frames
perform functional checks
18
100
PERIODIC REPLACEMENTS
22 23
PART/COMPONENT FREQUENCY
Operation cycles Time (years)
Motor_1 and AUX Motor 1 000 000 --
Motor_1 and AUX Motor vibration damper rubber pads 2 000 000
Motor_1 and AUX Motor crescents 2 000 000
Lower guide shoe 2 000 000 --
Carriages 2 000 000 --
Belt 1 000 000 5
Mechanical stops 2 000 000 5
Safety fall arrest cables -- 5
Emergency battery -- 1