EasyManua.ls Logo

FAAC S450H - Bleeding Procedure; Preparing for Bleeding; Performing the Bleeding Operation

FAAC S450H
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
FAAC Model S450H 24V Hydraulic Swing Gate Operator
a
11. Establish the xing position of the front bracket on the leaf
and mark the xing points (Fig. 12) (the operator must be
perfectly level).
12. Disassemble the operator from the front bracket to avoid
damaging the rod when the front xing is installed on the
gate.
13 Weld the front bracket directly on the leaf or screw it by
means of threaded inserts.
14. If an opening mechanical stop on ground is not installed,
spacers can be used (Fig. 1 Ref. 7). Remove the front ar-
ticulated joint and insert on the rod the number of spacers
required to reach the desired opening angle (Fig. 14).
If an external mechanical
stop point at closure is
present, extend the rod
completely and then
insert it 0.25 inches.
Fig. 12
Fig. 13
Fig. 15
Fig. 16
MINIMUM
BENDING
RADIUS
2.5 INCHES
MINIMUM
BENDING
RADIUS
2.5 INCHES
Fig. 17
Fig. 14
15. Secure the operator to the front bracket (Fig. 15).
16. Remove the bleed screw (Fig.16 Ref. a) paying special
attention to leave the sealing O-Ring in its seat.
17. Install the metallic protection cover as shown in Fig. 16,
insert and tighten both tie-rods.
18. Connect the cable to the operator using the two screws
supplied, as shown in Fig. 17.

Other manuals for FAAC S450H

Related product manuals