FERROLI F30
1
2
3.01 Drilling Template (Top Flue Application)
Select suitable mounting position for boiler, using the template mark fl ue outlet and boiler mounting points.
Drill two 10mm holes 90mm deep to accept the wall plugs, fi t wall plugs. Fit two special wall plugs on the wall as
described in the fi g. 12a. Fasten the wall bracket to the wall using an antitheft nut on the right side and a standard
nut (M8) on the left side. Mount the boiler on the wall bracket and fi x using an antitheft nut on the left side and a
standard nut (M8) on the right side. Using a core drill cut a 118mm diameter hole for the fl ue.
1.
CH fl ow (
22
mm)
2
.
Safety
Valve
(
1
5
mm)
3
.
D
om
e
s
t
ic
h
o
t
w
ate
r
o
u
tlet
(
1
5
mm)
4
.
G
a
s
su
pp
ly
(
22
mm)
5
.
D
om
e
s
t
ic
h
o
t
w
ate
r
i
n
let
(
1
5
mm)
6
.
CH
r
et
ur
n
(
22
mm)
F
i
g.
12
b
75
5 min
195 min
200 min
955 min
200
460 min
123 4 5 6
15 15
Ø3/4''Ø3/4'' Ø1/2''Ø1/2''Ø1/2''Ø1/2''
==
Ø120
jig bracket
F
i
g.
12
a