PAGE/6 Doc.P/N06‐312
Rev.11/March2020
4.1 ContainerValvePreparation
Therearetwomethodsavailableforfillingthecontainers,eitherbypressureorbyweight.Thepreferredmethodisto
fillbyweight,asthisismoreaccurateandnottemperature‐dependent.
Detailedbelowarethestepsnecessarytopreparethecontainervalveassemblyforfilling:
Connectthefilladaptor(FasTest®METHP0198Aorequivalent)tothevalveoutletport(valveoutletisa
G⅝"malethreadandthefilladaptorisaG⅝"femalethreadwithaswiveladaptorononeendand3/8"NPT
ontheotherend).Thefilladaptershouldbe
connectedtothefillmanifoldviathe3/8"NPTport.
Figure4.1‐1FillAdapterConnections
Connectthefillinghosetothefilladapter.
Step3: Assemblethevalvefillingtooltothespringwasherontopofthevalve(seeFigure4.1‐2).Ensurebothscrews
onthebottomhalfofthefillingtoolsitflatontopofthevalvebody.Securethetop
capontothebase
assemblywiththe¼‐20UNCcapscrew.Ensurethetopcapisfullyengaged,withthecapscrewheadresting
firmlyagainstthetopthrustwasherandthebottomthrustwasherrestingfirmlyagainstthetopcap.
Figure4.1‐2ValveFillingComponents
AssembledContainer
G5/8"FemaleSwivel
(forG5/8"maledischargeport)
3/8"NPTMaleThread
(forfillhoseconnection)
¼‐20UNCCapScrew
(1)Needle‐RollerThrustBearing
TopCap
(2)M6x1CapScrews
BaseAssembly