4.3 FillbyPressure
IG55(50%Argonand50%NitrogenMixture)
TheIG55inertgasmixtureconsistsnominallyof50%argonand50%nitrogen.Themixturespecificationisargon
50±5%nitrogen50±5%.
DetailedbelowarestepsnecessarytofillthePROINERTcontainerwithIG55bypressure:
Connecttothevalveoutletandpull25"to27"ofthevacuumtoremoveresidualatmosphereandmoisture.
Fillthecontainerviathevalveinletwithargontothepressureindicatedinthetablebelowforthesystem
pressurerequired.
Topoffthecontainerwithnitrogentothefinalfillpressureperthetablebelow.Ifnecessary,refertothe
pressurevs.temperaturechartforIG55inAppendixA.2.
Size(Liters) ArgonPressure@59°F(15°C)
FinalPressure@59°F(15°C)
(TopupwithNitrogen)
80 1,450to1,670psi(100to111.5bar) 2,900psi(200bar)
80 2,045to2,263psi(141to156bar) 4,350psi(300bar)
NOTE: Performapreliminaryleakcheckatthecylinderneckwithasoapsolution(SwageLokSnooporits
equivalent)onceithasbeenfilledwithargon.Ifaleakisdetected,discontinuefillingthecylinder.
Verifythecontainerbyensuringthefinalfillpressureisasdetailedaboveat59°F(15°C).Ifrequired,referto
thepressurevs.temperaturechartforIG55inAppendixA.2.
Closethevalvebyunscrewingthecentralscrewonthefillingadaptorandremovingthetophalfofthe
adaptor.Thedowelontheinternalpieceofthefillingadaptorshouldmovedownwardduringthisoperation.
ProceedwithremovalofthebottomhalfofthefillingadaptorbyunscrewingthetwoM6capscrews.Remove
thisadaptorfromthevalveandcheckthatthespringwasherhasdroppedlowerthanitsoriginaldepth.
Ventthefillinghoseandcheckthatthereisnoflowfromthevalveoutlet.
Fitthevalvelockoutassembly ontothevalve(Figure4.3.1.1)priortoremovingthefillinghose.
Removethefillinghoseandscrewtherecoilcapontothedischargeoutlet.
Removethevalvelockoutassemblyfromthevalveaftertherecoilcaphasbeenfitted.
Proceedtoleakchecking(Section5).
Checkcontainerpressure(Section6).
Oncetestingiscomplete,screwthe
shipping/safetycapontothecylinder.
Figure4.3.11IG55ContainerwithValveLockoutAssemblyInstalled
ValveLockout