EasyManua.ls Logo

Fike PROINERT 2 - IG-100 (100% Nitrogen)

Fike PROINERT 2
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Doc.P/N06312
Rev.11/March2020
PAGE/11
ValveLockout
IG100(100%Nitrogen)
TheIG100inertgasconsistsof100%nitrogen.
DetailedbelowarethestepsnecessarytofillthePROINERTcontainerwithIG100bypressure:
Connectthevalveoutletandpull25"to27"ofthevacuumtoremoveresidualatmosphereandmoisture.
Fillwithnitrogentothepressureindicatedinthetablebelowforsystempressurerequired.Ifrequired,refer
tothepressurevs.temperaturechartforIG100inAppendixA.2.
Size(Liters)
FinalPressure@59°F(15°C)
80 2,900psi(200bar)
80 4,350psi(300bar)
NOTE: Performapreliminaryleakcheckatthecylinder’sneckwithasoapsolution(SwageLokSnoopor
equivalent)onceithasbeenfilledhalfway.Ifaleakisdetected,discontinuethefillforthatparticular
cylinder.
Closethevalvebyunscrewingthecentralscrewonthefillingadaptor,thenremovethetophalfofthe
adaptor.Noticethedowelontheinternalpieceofthefillingadaptormovedownwardsduringthisoperation.
ProceedwithremovingthebottomhalfofthefillingadaptorbyunscrewingthetwoM6setscrews.Remove
thisadaptorfromthevalveandcheckthatthespringwasherhasdroppedlowerthanitsoriginaldepth.
Ventthefillinghoseandcheckthatthereisnoflowfromthevalveoutlet.
Fitthevalvelockoutassembly ontothevalve(Figure4.3.21)priortoremovingthefillinghose.
Removethefillinghoseandscrewtherecoilcapontodischargeoutlet.
Removethevalvelockoutassemblyfromthevalveaftertherecoilcaphasbeenfitted.
Checkthecontainerpressure(Section6).
Oncetestingiscomplete,screwthesh ipping/safetycapontocylinder.
Figure4.3.21IG100ContainerwithValveLockoutAssemblyInstalled

Table of Contents