EasyManua.ls Logo

Fike PROINERT 2 - IG-541 (52% Nitrogen, 40% Argon, and 8% Carbon Dioxide Mixture); Figure 4.2.3-1 Ig-541 Container with Valve Lockout Assembly Installed

Fike PROINERT 2
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Doc.P/N06312
Rev.11/March2020
PAGE/9
IG541(52%Nitrogen,40%Argon,and8%CarbonDioxideMixture)
TheIG541inertgasmixtureconsistsnominallyof52%nitrogen,40%argon,and8%carbondioxide.Themixture
specificationisnitrogen52±4%,argon40±4%,carbondioxide8+1%/‐0%.Detailedbelowarethestepsnecessary
to
fillthePROINERTcontainerwithIG541.
Connecttothevalveoutletandpull25"to27"ofvacuumtoremoveresidualatmosphereandmoisture.
Fillthecontainerviathevalveinletwiththeindividualgasesinthefollowingorder:Carbondioxide,then
argon,andthennitrogen,asdetailedinthetablebelowforthesystempressurerequired:
Size
(Liters)
Carbon
Dioxide
(kg)
Argon
(kg)
Nitrogen
(kg)
Resultant
IG541
(kg)
FinalFill
Pressure
@15°C(bar)
FinalFillPressure
@59°F(psi)
80 2.472.49 10.7611.66 9.81 10.63 23.0424.78 200 2,900
80 3.503.54 14.8216.06 13.4914.61 31.8134.21 300 4,350
NOTE: Performapreliminaryleakcheckatthecylinderneckwithasoapsolution(SwageLokSnooporequivalent)
onceithasbeenfilledhalfwaywithargon.Ifaleakisdetected,discontinuethefillforthatparticular
cylinder.
Verifythecontainerbyensuringthatthefinalfillpressureisasdetailedaboveat59°F(15°C).Ifrequired,
refertothepressurevs.temperaturechartforIG541inAppendixA.2.
Closevalvebyunscrewingthecentralscrewonthefillingadaptorandremovethetophalfoftheadaptor.
Noticethedowelontheinternalpieceofthefillingadaptormovedownwardsduringthisoperation.
ProceedwithremovalofthebottomhalfofthefillingadaptorbyunscrewingthetwoM6setscrews.Remove
thisadaptorfromvalveandcheckthatthespringwasherhasdroppedlowerthanitsoriginaldepth.
Ventthefillinghoseandcheckthatthereisnoflowfromthevalveoutlet.
Fitthevalvelockoutassembly ontothevalve(Figure4.2.31)priortoremovingthefillinghose.
Removethefillinghoseandscrewtherecoilcapontothedischargeoutlet.
Removethevalvelockoutassemblyfromthevalveaftertherecoilcaphasbeenfitted.
Proceedtoleakchecking(Section5).
Checkthecontainerpressure(Section6).
Oncetestingiscomplete,screwthesh ipping/safetycapontothecylinder.
Figure4.2.31IG541ContainerwithValveLockoutAssemblyInstalled
ValveLockout

Table of Contents