REVISIONHISTORY
REVISION/DESCRIPTIONOFCHANGE REVISIONDATE
REVISIOND....................................................................................................................................................JULY,2004
1) ChangedValveFillingAdaptorp/nfrom90032908top/nIG71‐064inSection2Item5onpage4andinStep3
onpage8.
2) Changedp/nfromIG71‐0151toIG71‐0152onpage8.
3) Formattingchanges.
R
EVISIONE....................................................................................................................................................JULY,2011
1) UpdatedSection2Equipment.
2) UpdatedFigures2,3,4&5
R
EVISION6..............................................................................................................................................JANUARY,2013
1) Replacedexistingequipmentlistin2.0EquipmentSectionwithinformationfromManual06‐377.
2) UpdatedtheFigures2,3,4,5
3) ReplacedexistingSteps1,2,3&4withinformationfromManual06‐377.
R
EVISION7....................................................................................................................................................JULY,2013
1) Editorialchangesandupdatingof300barinformation.
R
EVISION8...........................................................................................................................................SEPTEMBER,2014
1) Changedtitlefrom“Recharge(Fill)Procedure”to“FillandPackagingProcedure.”
2) Addeddualunitsthroughout.
3) Addedshipping/safetycapprecautiontoSection1.3.
4) AddednewequipmentinSection2.0–Cylinder/ValveEngagementGages(P/NIG71‐0233),FillAdaptor
(FasTest®METHP0198A),PressureGaugeAssembly(P/N70‐284),and
ValveLockoutAssembly(P/NIG71‐
235).
5) RevisedvalveinstallationprocedureinSection3.2.2touseaspecificquantityofhigh‐densityPTFEthread
sealtapeandGasoilaSS‐16Soft‐Setthreadsealant,andaddedinstructionsonhowtousethecylinder/valve
gages.
6) AddedFigures3and4
inSection3.2.2.
7) RevisedstepsforpreparingthevalveassemblyforfillingtoreflectnewFillAdaptor(FasTest®METHP0198A)
inSection4.0.
8) RevisedFigure6andStep3inSection4.0toreflectaddedneedle‐rollerthrustbearingandwashersonValve
FillingTool.
9) Changedfillweightvalues
inSection4.1.1for300barfill;13.23‐13.73was13.23‐13.72(Nitrogen),18.91‐
19.73was18.04‐18.84(Argon),and32.64‐32.96(ResultantIG‐55).
10) AddedNoteinSections4.1.1,4.2.1.1and4.2.1.2toperformapreliminaryleakcheckafterthefirstgasis
filled.
11) UpdatedFigure7
toshownewValveLockoutAssembly(P/NIG71‐235).
12) AddedNoteinSection5.0todryvalvepriortousingargonleakdetector.
13) UpdatedFigure10toshownewPressureGaugeAssembly(P/N70‐284).
14) AddedSection7.1LabelPlacement.
15) AddedSections8.0CylinderPackaging,8.1Packaging
Materials,and8.2PackagingProcedure.