EasyManua.ls Logo

Fireye YB110 - Page 30

Fireye YB110
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
£
9. With flame proven at the end of PTFI, the main flame trial for ignition (MTFI) period begins.
Terminal 7 is energized. The BLV512 will display:
Terminal 5 is de-energized 10 seconds later and Terminal 6 is de-energized after another 5 seconds.
10. The firing rate motor is now sent to the automatic modulation position (10-11 circuit made) and
is under the command of the proportional controller. The BLV512 will display:
Normal Shutdown
1. When the operating control circuit (L1-3) opens, the main fuel valve is de-energized. The firing
rate motor is driven to the low purge position (10-12 circuit made).
2. Following a 15 second post purge, the burner/blower motor is de-energized.
3. The burner is now off and the BLV512 will display
PTFI 20
FLAME SIGNAL
MTFI 35
FLAME SIGNAL
AUTO 40
FLAME SIGNAL
POST PURGE 0:05
CYCLE COMPLETE
STANDBY
L1-3 OPEN