9. With flame proven at the end of PTFI, the main flame trial for ignition (MTFI) period begins.
Terminal 7 is energized. The BLV512 will display:
Terminal 5 is de-energized 10 seconds later and Terminal 6 is de-energized after another 5 seconds.
10. The firing rate motor is now sent to the automatic modulation position (10-11 circuit made) and
is under the command of the proportional controller. The BLV512 will display:
Normal Shutdown
1. When the operating control circuit (L1-3) opens, the main fuel valve is de-energized. The firing
rate motor is driven to the low purge position (10-12 circuit made).
2. Following a 15 second post purge, the burner/blower motor is de-energized.
3. The burner is now off and the BLV512 will display
PTFI 20
FLAME SIGNAL
MTFI 35
FLAME SIGNAL
AUTO 40
FLAME SIGNAL
POST PURGE 0:05
CYCLE COMPLETE
STANDBY
L1-3 OPEN

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fireye YB110 and is the answer not in the manual?

Fireye YB110 Specifications

General IconGeneral
BrandFireye
ModelYB110
CategoryControl Unit
LanguageEnglish

Related product manuals