+
_
5.1
5.2
5.3
2
1
M
D
L
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
Compare water level after tank has lled with existing
line marked in step 1.1. The new ll valve comes with an
adjustment screw found at the end of oat control arm.
Turn screw clockwise to increase water level, and
counter-clockwise to decrease water level.
As marked
in step 1.1
The blue oat controls the
half ush.
(1) Pull out stop (D) on blue
oat (M).
(2) Raise blue oat (M) to the
TOP of the rail (L).
www.uidmaster.com
10
Step 5: Final adjustments
5.1 Fill valve adjustment
5.2
Adjust blue oat