EasyManua.ls Logo

Fluiteco SD - Lifting and Installation; Checks After Reception; Lifting and Positioning

Fluiteco SD
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
LIFTING AND INSTALLATION
CHECKS AFTER RECEPTION
When receiving the machine it is necessary to check if the type and the quantities are as per order confirmation. It is
necessary to verify also that the machine is complete in all the parts as per the transport document.
Before unloading, please check that the machine was not damaged during the transport. In case of damages, it is
necessary to make a short description on the transport document.
LIFTING AND POSITIONING
Lifting and positioning of the machine can be done by means of suitable lifting system for the weight and dimension
(for the weight of the machine, please check the weight present on the Name plate). In case of machine supplied in a
wood cage, please take note also about its weight.
The lifting of the machine must be always done using suitable lifting eyebolts fixed on the machine. Always use them
for transportation using hooks with safety fasteners.
Always lift and move the machine using only the eyebolts positioned on the machine.
Lifting Points Lifting Points
Lifting Points
Picture 1: Lifting of the machine by means of hooks put in the appropriate lifting eyebolts