EasyManua.ls Logo

Fluke CableAnalyzer DSX-602 - Settings for Twisted Pair Tests

Fluke CableAnalyzer DSX-602
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Certify Twisted Pair Cabling
Settings for Twisted Pair Tests
31
Settings for Twisted Pair Tests
Table 2 gives descriptions of the settings for twisted pair tests. To
set up a project, which includes the settings in Table 2, cable IDs,
and operator names, see Chapter 5.
To set up a twisted pair test
1 On the home screen, tap the test setup panel.
2 On the CHANGE TEST screen, select a twisted pair test to
change, then tap EDIT.
Or to set up a new twisted pair test, tap NEW TEST.
3 On the TEST SETUP screen, tap the panels to change settings
for the test. See Table 2.
4 On the TEST SETUP screen, tap SAVE when your test setup is
completed.
5 On the CHANGE TEST screen, make sure the button next to
the test is selected, then tap USE SELECTED.

Table of Contents

Related product manuals