Part No. 90-0113-00
Fdmman2.p65 2/98
and must be removed or damage will result.
Refer to page 19 for more information or call
Heart Interface.
3. Test the battery charger function:
With shore power applied and the
transfer switch engaged, the battery charger
should be in operation.
NOTE: The charger will work with the
switch in the OFF position. Verify the charger
is working by using a Volt meter. The battery
voltage gradually increases. If using a
Freedom Remote Control Panel, the DC
Amps LED indicates the current level the
charger is putting out and the DC Volts LED
indicates an increase in battery voltage on the
DC Volts indicator.
Turn the power switch ON and
disconnect shore power. The inverter should
automatically pick up the load when shore
power is removed.
Repeat the test for transfer and battery
charger with the generator if you have one.
Congratulations, you have completed a
successful installation.
INSTALLATION
27