7
Required
Step Description Section
1 Assemble and power up the Y shape sensor 5.2.1–5.2.3
2 Power up the display console and synchronize
with Y shape sensor
5.4
5 Mount the sensor array 5.2.4
3 Set date and time on console 6.4.5
4 Calibrate the relative pressure to sea-level
conditions (local airport) on console
6.7.1
6 Reset the rain to zero on console 6.4.10
Optional
7 Configure WiFi 8.1
8 Register and upload to Weather Server 9
4. Pre-Installation Checkout and Site Survey
4.1 Pre Installation Checkout
Before installing your weather station in the permanent location, we
recommend operating the weather station for one week in a temporary
location with easy access. This will allow you to check out all of the
functions, insure proper operation, and familiarize you with the weather
station and calibration procedures. This will also allow you to test the
wireless range of the weather station.