/ Perfect Charging / Perfect Welding / Solar Energy
42,0410,2213 004-19092016
Fronius Primo
10.0-1 / 11.4-1 / 12.5-1 / 15.0-1
Installation
www.youtube.com/FroniusSolar
LEARN MORE WITH
OUR HOW-TO VIDEOS
Question and Answer IconNeed help?

Do you have a question about the Fronius Primo 10.0-1 and is the answer not in the manual?

Fronius Primo 10.0-1 Specifications

General IconGeneral
Maximum Input Voltage1000 V
Max. output current43.5 A
AC Output Frequency50 / 60 Hz
THD< 3 %
Maximum Efficiency98.1%
Protection RatingIP 65
Rated Output Power10000 W
Max. apparent AC power10000 VA
Maximum DC Power13000 W
Operating Temperature Range-25°C to +60°C

Summary

Important Safety Instructions

General Safety Guidelines

General instructions for inverter installation and maintenance, emphasizing reading safety procedures.

Hazard Warnings and Precautions

Details warnings for hazards to equipment or personnel and potential damage.

Electrical Installation Standards

Covers compliance with National Electrical Code, ANSI/NFPA 70, and Canadian standards.

Fire Prevention and Installation Precautions

Grounding and Cable Connection Best Practices

Ensures proper grounding, cable tightening, and checks for damage during installation.

Secure Inverter Mounting

Details securing the inverter to the wall bracket using fastening screws to specified torque.

Knockout Ports and Conduit Sizing

Caution: Metal Debris in Connection Area

Warning to remove fallen parts from the connection area before hanging the inverter.

Conduit Size Specifications

Lists available conduit sizes for DATCOM, AC, and DC connections.

Grid Connection Types and Diagrams

Delta Grid Configurations

Diagrams and setup details for various Delta grid configurations.

WYE and Stinger Grid Configurations

Diagrams and setup details for WYE and Stinger grid configurations.

Split Phase Grid Configuration

Diagram and setup for split phase grid configurations.

Connection Diagram and Terminals

System Connection Diagram

Illustrates the connection of solar modules, inverter, and grid components.

Terminal Block Layout

Details the layout and torque specifications for AC and DC terminal connections.

AC Wire Specifications (Copper & Aluminum)

Details wire gauge and type compatibility for AC connections.

AC Connection Procedures

AC Terminal Connection Details

Instructions for connecting AC wires to the terminal block, including torque and spacing.

AC Circuit Protection and Wiring Standards

Details on RCD type and compliance with national standards for AC circuits.

DC Connection Procedures

DC Connection Best Practices

Illustrates correct and incorrect methods for DC cable connections.

DC Cable Preparation

Shows how to strip and prepare DC cables for connection.

DC Connector Wiring

Details connecting DC cables from solar modules to the inverter's DC inputs.

DC Cable Stripping Specifications

Provides specifications for stripping DC cable insulation length.

Optional Components and System Configuration

Option Terminal Wiring and Torque

Details wiring and torque specifications for connecting option modules.

DATCOM Module Installation

Instructions for installing the DATCOM communication module.

PV Array Configuration and Testing

Shows PV array configurations and voltage testing procedures.

Fuse Replacement and Specifications

Fuse Location and Current Rating

Identifies fuse locations and the maximum current rating for each terminal.

Fuse Replacement Procedure

Provides instructions on how to safely replace faulty fuses with new ones of the same rating.

Data Communication and Solar Net

Fronius Solar Net Overview

Explains Fronius Solar Net as a data network for connecting multiple inverters.

Data Communication Ports and Interfaces

Details the ports and interfaces in the data communication area.

Module Connections and Indicators

Describes module connections, indicators, and USB socket functionality.

Data Logging and System Examples

Illustrates data logging setup and system examples with Fronius components.

DATCOM Module Installation

Accessing DATCOM Module Compartment

Procedure for opening the DATCOM module compartment.

Installing DATCOM Module

Steps for installing the DATCOM module into the inverter.

Securing DATCOM Module

Details on securing the DATCOM module with screws.

Re-attaching DATCOM Cover

Instructions for re-attaching the cover after DATCOM module installation.

DATCOM Module Connection

DATCOM Connection Preparation

Shows preparation steps for connecting DATCOM cables.

Connecting DATCOM Cables

Illustrates the process of connecting DATCOM cables to the module.

Mounting Inverter with DATCOM

Shows how to mount the inverter after DATCOM connection.

Final DATCOM Connection Checks

Final checks and connections for the DATCOM module.

Conduit Sealing for Environmental Protection

Preventing Condensation in Conduits

Explains how condensation can damage components and the need for sealing.

Conduit Sealing Procedure

Demonstrates the procedure for sealing conduits with elastic sealant.

Inverter Operation and Setup

Power Controls and Engagement

Details inverter power controls, locking mechanism, and engagement procedures.

Initial Setup Procedures

Covers language, country, date, and time setup for the inverter.

System Configuration and Testing

Instructions for AC connection, daylight saving, MPP tracking, and grid tests.

Inverter Locking Mechanism

Using the Padlock

Instructions and notes on using a padlock for securing the inverter.

Firmware Update Procedure

Updating Firmware via USB

Procedure for updating inverter firmware using a USB device.

BASIC Menu Options

AC Output Power Display

Shows the display for AC output power.

Access Code Entry

Procedure for entering access codes.

BASIC Menu Navigation

Lists available options within the BASIC menu.

Field Adjustable Trip Points

Voltage Trip Point Settings

Details adjustable trip points for 208V, 220V, 240V, and 50Hz grid voltage setups.

Frequency and NLMON Trip Settings

Specifies trip limits for frequency and NLMON settings.

Reconnection, Accuracy, and Defaults

Provides reconnection parameters, accuracy specifications, and default settings.

Serial Number Sticker Application

Serial Number Sticker Application Example

Illustrates how to apply serial number stickers for customer use.

Fronius Technical Support Information

Fronius USA Support

Contact details and website for Fronius USA technical support.

Fronius Canada Support

Contact details and website for Fronius Canada technical support.

Fronius Mexico Support

Contact details and website for Fronius Mexico technical support.

Fronius International Support

Contact details and website for Fronius International technical support.