EasyManua.ls Logo

FUHR multitronic 881 - Installation Instructions; Routing and Drilling Operations

FUHR multitronic 881
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
WWW.FUHR.DE
multitronic
881/881GL/ServoAccess
4 Installation instructions
4.1 ROUTING AND DRILLING OPERATIONS
The routings for the FUHR multipoint locking system multitronic 881 are carried out in accordance with the routing drawing
provided.
In addition to the conventional routings for
FUHR multipoint locking systems, for example
on multisafe 855, only 2 additional routings in
the door leaf and the door frame are required.
These installation instructions therefore only
describe the additional routing and drilling ope-
rations for the electronic locking mechanism.

Table of Contents

Other manuals for FUHR multitronic 881