EasyManua.ls Logo

Fuji Electric UGx20 SERIES - Page 93

Fuji Electric UGx20 SERIES
275 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 - 24
8 MITSUBISHI PLC 2
PLC
D-sub 25pin(Male: )
D-sub 25pin(Male: )
FG
SG
1
7
12
13
14
17
2
7
15
SG
16
4
17
5
18
20
21
3
18
19
24
25
POD (CN1)
+
SD
-
SD
+
RTS
-
RTS
-
CTS
+
CTS
+
RD
-
RD
+
RxD
+
TxD
+
DSR
+
DTR
-
RxD
-
TxD
-
DSR
-
DTR
*
Use twist shielded cables.
Wiring
The following is a diagram to show the wiring of the cable which connects POD to PLC.
(connection of the UG200C-M)
RS-422
Wiring Diagram 1
According to our noise tests, the attachment of a ferrite core improves
noise voltage by 650~900V and aids in preventing communication errors.
Note
In case of direct connection with the CPU port of A/QnA series, be sure to attach the
ferrite core to the cable between POD and the CPU port of A/QnA series for noise.
A Ferrite core is sold as an optional accessory.
A noise filter(ferrite core) is sold as an optional accessory. When you buy it, specify
“ZCAT032-0930” as the model name.
In consideration of such noise problems, it is recommended that the standard type link
unit be used in such a case when the cable length of more than 15m is required.
POD
A/QnA Series
CPU
Ferrite core

Table of Contents

Related product manuals