G.Weike Laser
Profession Laser Manufacturer more than 15 Years.
16
-An external laser pipe: fiber laser special pipe (laser attached). If the pipe length of
the water cooling machine is more than 10 meters, need to increase the pipe size,
must make sure the pressure difference which laser need to. Various laser, each
tube connection size also varies .Other cooling water pipe, Pay attention to pipe joint
sealing.
a)
Install conditions
The installation conditions of water chiller should be installed in the rain and
snow proof and no corrosive gas, the ambient temperature in 2-38 . Should be
leave sufficient units in and out of the wind ventilation space during the
installation process ,the top of the unit distance from other objects should more than
2.5 meters, and around the unit distance of other objects should more than1.5
meters to ensure smooth air flow, it is forbidden to install the unit in ventilation in
a closed stuffiness room, must ensure that the hot air from the water chiller is
not back flow to the surface which into wind of the unit’s condenser.(Please
refer Picture 3-1)
b)
Machine check
First clean the clutter in the water tank, to ensure that the water tank clean
without impurities inside; Then check the joint of pipe system whether loose or not.
c)
Installation method
Picture 4-1 Picture 4-2
Picture4-3
Please insert the A1 water line into A1 port,A2 water line into A2 port,A3 water
line into A3 port,A4 water line into A4 port. Please tighten the nut of water protection