GE MEDICAL SYSTEMS CT9800 QUICK SYSTEM
Rev. 14 Direction 18000
4-3-56
3-10 Final Mag Tape Check (Continued)
ADES ONLY
a. Mount and load the DCG Diagnostic Tape. If necessary, refer to the DTOS Manual, Volume 1,
Part 1, for details.
b. At the prompt (ADES-CLI>), observe the following and type the underlined responses:
ADES-CLI> DMTR RELI ‘CR’ (Be sure to enter DMTR_RELI with no spaces)
START TIME? - MON.DAY, YR HR. MIN
ENTER DEVICE CODES (UP TO 8. OCTAL #’S) - 0
ENTER DEVICE CODES (UP TO 8. OCTAL #’S) - 22
DEVICE SELECT -22
UNIT NUMBERS 0
CONTROLLER TYPE
(6123,6125,6230,6231,6270,6026,4307,4030,6300(9-TRACK)]-
6026
TEST MODE (PE,NRZ,CGR,ALL(DUAL MODE DRIVES ONLY))?
UNIT: 0 ALL
ERRORS PER UNIT TO STOP TESTING(DEC #.CR=65536.) ‘CR’
ARE MAPS TO BE EXERCISED (YES/NO) ?
testing
DEVICE SELECT -22 UNITS: 0.
502 - SEQUENTIAL MEDIA VERIFICATION WITH OPTIONS
OPTIONS ARE:
DATA: (SEE 4. DATA PATTERNS)
TEST TO END OF TAPE(EOT)? (YES/NO)
IF NO/400. RECORDS ARE WRITTEN/READ
WORD COUNT (RAN.MAX. OR N.(CR)=1000.)=
503 COMMAND STRING
505 RUNALL
506 SPACING EXERCISER
507 SHORTENED RUNALL W/O EOT CHECK
510 ERROR LOG RECOVERY
MORE HELP ?? (0 - 6) (0=EXIT, 1= INDEX): 0
START ADDRESS (OCTAL) = 505
MAGNETIC TAPE RELIABILITY PROGRAM REV 04. TEST # 505
MOUNT SCRATCH TAPE
SET SWPACK AND HIT (CR) TO CONT.
3-11IC System Check
Checkout of the IC subsystems are the same as for the 9800 system, refer to the preceding portions of Section
3 in this manual. If tape compatibility problems occur between the IC and 9800 Mag tape systems check head
alignment of both systems. Refer to DG’s 6026 Maintenance Manual which can be found in 6026 Mag Tape
Manual, Part 4 for head alignment procedure.