EasyManua.ls Logo

GE CT-9800 - SECTION 1 INTRODUCTION

GE CT-9800
510 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS CT 9800 QUICK SYSTEM
Rev. 1 Direction 18000
4-1-1
SECTION 1 INTRODUCTION
The 9800 Functional Check procedure is intended for the following purposes:
1. A thorough post-installation check to ensure the entire 9800 system is operating properly.
2. A procedural reference from Chapter 10 Periodic Maintenance that contains an abbreviated list of PM steps.
3. A thorough post-FMI (Field Modification Instruction) check to ensure the entire 9800 system is operating
properly after an FMI has been installed.
4. A prediagnostic check to determine symptoms of a failure prior to attempting to perform any service
adjustments or troubleshooting. Also, a post-diagnostic check to ensure proper operation has been restored.
If a step in the procedure fails its measurement, refer to Chapter 6 (Adjustments) of this manual or Chapter 8
(Diagnostics) of this manual to restore operation. After operation is restored, refer back to this chapter and
verify system performance using the functional check procedure.
1-1 Post-Installation
To reduce the time required for post-installation check-out, the following glow chart describes installation and
check-out procedures that can be performed in parallel and those procedures which must be performed in series
after other checks have passed.

Table of Contents

Related product manuals