EasyManua.ls Logo

GE CT-9800

GE CT-9800
510 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS CT 9800 QUICK SYSTEM
Rev. 19 Direction 18000
4-13-7
13-13 Center Flat Phantom
Next, center the 5” flat poly crosstalk phantom to within ± 0.5 mm.
13-14 Scan Flat Phantom
Repeat the 12 scans as depicted for the slope phantom in section 13-12, except enter “Flat Phantom” when the
system asks for “Name” at the Patient/Exam Parameters Screen.
13-15 Turning AutoTest OFF
The AutoTest function will turn off automatically after 24 recons have been completed. To explicitly turn off
AutoTest mode before AutoTest completes cancel to R-level. To run normally, run “M”. To run service mode
without autotest, run REGEN/S first and turn off autotest.
NEW AUTOTEST Activity value (Y?N): type N, return to turn off AUTOTEST.
13-16 reconDataLog File
The file QDR:SLOPECAL.LG is created by the reconDataLog function. The file is updated after each
reconstruction has completed. Data is logged until the maximum number of 1000 recons has been reached.
Note: If you wish to save the recon.log to tape:
a) Mount a tape: DIR QDR
INIT MT0
DUMP/A/V MT0:0 SLOPE-.LG
or
b) Run SNAPS
13-17 Notes re reconDataLog and AutoTest
1. Status of both of these operations, and log file contents is available by running REGEN/V.
2. reconDataLog will run in M or M/S. Autotest will run only in M/S.
3. They use separate logs, and clear only when restarting a specific log. Both logs may be stored on tape by
DUMP, SDUMP, or SNAPS.
13-18 Execute Auto Summary - Enter DIR CTDS and type AUTOSUM, return. SEE DIR 46-018000, 8-4 to
interpret the results. AUTOSUM turns OFF by itself. Auto Summary is on the General Diagnostic
Tape. Please load this tape before trying to execute AUTOSUM.
R
DIR CTDS
R
AUTOSUM

Table of Contents

Related product manuals