Testing Hardware I/O Points, Continued
Procedure: Verify Digital Output (continued)
Step Action
7
Press the SPACE BAR to select Pulse and press ENTER
8 In the Off time field, type 500 and press ENTER
9 In the On time field, type 500 and press ENTER
10 In the Repeat Command field, type 10 and press ENTER twice
Results: Listen carefully for an audible click of the point relay.
The test is considered successful if the relays click when
forced.
Notes
• The number of times that a control will operate is N+1, where N is the number of
repeats entered in the Repeat command field
Examples: For a single operation (i.e., no repeats) type 0;
for two operations, type 1
Test Failure
No error message appears in WESMAINT if the test fails. If relays do not
operate:
1. Ensure that the CONTROLS switch is in the REMOTE position.
2. Reboot the D25, and repeat the procedure.
3. Call GE Grid Solutions for assistance.
Repeat Test
To repeat the test sequence, press CTRL+U. Press ENTER.
Values entered for the previous test are retained until you exit the menu.
Test Next Point
To test another point, use the up or down arrow keys to cycle through points,
then press CTRL+U to repeat test.
Note
The same test procedure can be applied when testing the Aux. Output.