EasyManuals Logo

GE iBox User Manual

GE iBox
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
iBox/iBox Kit
Installation and Maintenance Guide
GE Grid Solutions
30
994-0047-5.10-4 GE Information
Physical Mounting
Procedure:
Mounting the
iBox
Step Action
1
Align the iBox in its proper position on a flat mounting surface.
2
Install and tighten the four screws, holding the iBox firmly in place on
the mounting surface.
3
Loosen the iBox top cover and remove the battery “PULL” tab. The
iBox is delivered with this tab in place to insulate the battery during
shipment.
Mounting and
Clearance
Leave at least one rack unit (RU) of space above and below the equipment to allow
for cooling air flow and cable routing (1 RU = 1.75 inches or 44.5
mm).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE iBox and is the answer not in the manual?

GE iBox Specifications

General IconGeneral
BrandGE
ModeliBox
CategoryController
LanguageEnglish

Related product manuals