EasyManua.ls Logo

GE J2S968

GE J2S968
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Instructions
PRE-INSTALLATION CHECKLIST (CONT.)
[] PRE-INSTALLATION CUTOUT
AND REQUIRED CLEARANCES
If cabinets are placed less than 30" above the
range, see Alternate Construction, Step 25E,
on page 18.
NOTE: Product meets UL requirements for
0" clearance to back and side walls.
Wall coverings, counters and cabinets around
range must withstand heat (up to 194°F)
generated by the range.
OVERALL DEPTH _ I
ij,___- 70 cm (27=1/2")
FollOW
30" Bin,
STANDARD INSTALLATION
If the construction of your cabinet cannot
provide a 1/4" flat area at the back of the
countertop opening, consider changing the
countertop to accommodate this dimension.
See Alternate Construction section. If the area
is not flat, excess tension may be applied to
the glass cooktop, causing breakage and
voiding the warranty.
=____
Wall
9/16"
min._
flat
1/4" min.
flat
25"
23-3/16" typically
9/16" ]
_min.
flat
r
_ 29-15/16"-30-1/16"_ I
smooth cut
Flat
area
36"
1/4" _ @
6

Other manuals for GE J2S968

Related product manuals