EasyManua.ls Logo

GE Kelman DGA 900 Plus User Manual

GE Kelman DGA 900 Plus
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
GEDE-GA_M-DLIS-TE.MA-041 Rev 1.1 4-Mar-22
GE
Grid Solutions
Kelman™ DGA 900 Plus
Transformer Monitoring System
Installation & Commissioning Manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the GE Kelman DGA 900 Plus and is the answer not in the manual?

GE Kelman DGA 900 Plus Specifications

General IconGeneral
Dissolved Gas AnalysisYes
Transformer MonitoringYes
Measurement TechnologyGas Chromatography
Power Supply100-240 VAC, 50/60 Hz
Gases MeasuredH2, CO, CH4, C2H2, C2H4, C2H6, CO2, O2, N2
Measurement ParametersDissolved Gas Concentrations
Measurement Range (C2H2)0 - 1, 000 ppm
Detection Limit (C2H2)1 ppm
Sample Volume5 ml

Summary

1 Introduction

1.1 Product Overview

Provides an overview of the Kelman DGA 900 Plus system's capabilities and architecture.

1.2 Scope

Details the manual's coverage, including DGA 900 Plus specific features and other related manuals.

2 SAFETY

2.1 Symbols

Explains the meaning of safety symbols used in the manual and on the DGA 900 Plus device.

2.2 Safety Statements

Lists essential safety statements and precautions to be observed during installation and service.

3 TECHNICAL SPECIFICATIONS

4 COMPLIANCE

5 TRANSFORMER MONITORING SYSTEM (TMS)

5.1 TMS Options

Describes the available TMS option packs for the DGA 900 Plus, including Thermal Models, Cooling Status, OLTC, and Bushing monitors.

6 CARD OPTION #1: THERMAL MODELS

6.1 Sensor Input Configuration

Details the input types and sensor configurations for the Thermal Models card.

6.2 Wiring

Explains the wiring requirements for the Thermal Models card, including terminal specifications.

6.3 Temperature Sensors

Describes the top and bottom oil temperature sensors and their connection for monitoring.

6.4 CT Sensors

Explains the function and specifications of the split core CT sensors used for transformer load measurement.

7 CARD OPTION #2: COOLING STATUS MONITOR

7.1 Sensor Input Configuration

Lists the input types and sensor configurations for monitoring up to four cooling banks.

7.2 Wiring

Provides wiring diagrams for analogue and digital inputs for the Cooling Status monitor.

8 CARD OPTION #3: OLTC MONITOR

8.1 Sensor Input Configuration

Details the inputs for the OLTC Monitor, including tap position, temperature, and torque sensors.

8.2 Motor Power Converter

Describes the active power measuring converter module used for OLTC motor torque monitoring.

9 CARD OPTION #4: BUSHING & PD MONITOR

9.1 Installation Layout

Guides the general installation layout for the Bushing & PD Monitor, including safety warnings.

9.2 Inside the Hub Module

Shows the internal components of the Hub module relevant to bushing and PD monitoring.

9.3 Power & Communications

Covers power supply and communication cable connections for the product, including safety regulations.

9.4 Bushing Adaptors

Details the installation process for Bushing Adaptors, including checks and grease application.

9.5 High Frequency Current Transformer (HFCT)

Explains the correct installation of HFCT sensors for detecting PD activity and minimizing noise.

9.6 Magnetically Mounted Temperature Sensors

Describes the installation of MMTS for measuring transformer top oil temperature.

9.7 Cabinet Connections

Details how to connect the sensors and cables to the product cabinet's terminal rail.

9.8 Bushing Adaptor Circuit Integrity Test Record

Outlines the procedure for testing the electrical integrity of the Bushing Adaptor installation.

10 COMMISSIONING & SERVICE

10.1 Factory Settings

Guides on how to view and reset factory settings for the DGA 900 Plus device.

10.2 Models

Explains how to reset specific models and their parameters within the DGA 900 Plus system.

10.3 OLTC Monitor Commissioning

Details the essential steps for commissioning the OLTC Monitor, including software requirements and files.

10.3.1 Prerequisite Commissioning Steps

Covers initial steps like testing product connection and disabling motor torque alarms.

10.3.2 Establish Baseline Settings

Guides on setting baseline parameters for OLTC, including tap position mapping and torque configuration.

10.3.3 Download DGA 900 Plus data to Perception

Explains how to download OLTC data from the DGA 900 Plus to Perception Desktop software.

10.3.4 Generate Configuration Files

Describes how to use Excel tools to generate OLTC configuration files like TapPositionCalibration.cfg.

10.3.5 Import Configuration Files to DGA 900 Plus

Details the process of importing generated configuration files into the DGA 900 Plus.

10.3.6 Finalisation

Final steps for OLTC commissioning, including tap position reset and re-enabling alarms.

10.4 Bushing & PD Monitor Commissioning

Outlines parameters and procedures for commissioning the Bushing & PD Monitor.

10.4.1 General Settings

Covers the initial configuration settings for the Bushing & PD Monitor, including voltage and frequency.

10.4.2 Voltage Measurement

Details how to measure voltage across bushing adaptor inputs and expected ranges.

10.4.3 C1% Measurement

Guides on checking C1% measurement accuracy and troubleshooting potential issues.

10.4.4 C.4 Tan δ (Power Factor) Measurement

Explains how to verify wiring and configure alarms for instantaneous Tan δ measurements.

10.4.5 PD Live HF Noise Threshold Measurement

Describes how to measure and adjust HF noise thresholds for PD detection.

10.4.6 PDI Associated Power Measurement

Details how to measure and adjust alarms for PDI Associated Power.

10.4.7 PD Average Apparent Charge Measurement

Guides on measuring and adjusting alarms for PD Average Apparent Charge.

10.4.8 PD Max Apparent Charge Measurement

Explains how to measure and adjust alarms for PD Max Apparent Charge.

10.4.9 Export Setting

Covers exporting the configuration settings to a PC for record-keeping.

10.4.10 Finalisation

Final checks for Bushing Adaptor failure alarms after installation.

Appendix A Parts and Tools List for Bushing & PD monitor

A.1 GE-supplied items (shipped with the product)

Lists standard items and installation kit components supplied by GE with the product.

A.2 GE Field Service Engineer (FSE)-supplied items

Lists items that a GE Field Service Engineer will provide for the installation.

A.3 Customer-supplied Items

Lists items that the customer must procure for the installation, such as cables and tools.