EasyManua.ls Logo

GE Moisture Image 1 Series - Changing a Matrix Display to a Graph

GE Moisture Image 1 Series
125 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
April 2004
4-6 Programming with PanaView
Changing a Matrix
Display to a Graph
To set a graph display of a single mode and unit:
1. Click on the [
Graph Display] button. The window changes to list
the graph parameters.
2. Click on the meter icon to show lists of the available modes and
units.
3. Double-click on the desired unit, and enter the parameters for the
graph, as shown in Figure 4-3 below.
4. Click on [
Apply] to change the graph, and on [OK] to confirm the
change and close the window.
5. Click on the [
Set Active Display] button to prompt the Series 1
screen to display the graph.
To toggle between the matrix display and the graph, click on the
[
Matrix Display] or [Graph Display] buttons. The window returns to
the display indicated.
Figure 4-3: Graph Programming Window

Table of Contents

Related product manuals