EasyManua.ls Logo

GE Moisture Image 1 Series - Loading New Software

GE Moisture Image 1 Series
125 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
April 2004
3-30 Advanced Programming
Loading New Software At some point, a new version of the MIS-1 operating software may be
released or your existing software file may become corrupted. To
update your own system, use the following guidelines:
1. Record all of the setup, configuration, calibration and reference
information from the MIS-1, and transfer required logs to a PC.
IMPORTANT: All of the settings will be lost when the code is
updated. Any logs will also be erased.
2. Obtain the new software file (with a *.cod extension) and save the
file to your PC hard drive.
3. Set up the MIS-1 with an RS232 cable connected to a COM port
(most likely COM1) on a PC having a communications program
like Hyperterminal. (See Setting Up the RS232 Communications
Port in Chapter 3 of this manual, and Connecting a PC or Printer
in Chapter 1 of the Service Manual.)
4. Start the communications program on the PC and select the COM
port with the connection to the MIS-1.
5. Set the following information:
Baud Rate = 19200
Data Bits = 8
Parity = none
Stop Bits = 1
Flow Control = none.
6. Turn on the power to the MIS-1.
7. Press and hold the 0 key.
Note: The display will indicate a message similar to
Reload Flash
via RS232 (Y/N)?
8. Press the YES key.
9. Choose the Transfer file menu and select Send File.
10. Select the XMODEM transfer protocol.
11. Select the file to send: the file that was saved to the PC hard drive.
The meter will reboot and load the new software.
Note: Once the software is loaded into the MIS-1, it will be
necessary to reprogram the configuration data, references,
recorders, alarms, logs, etc (see the previous sections in this
manual).
After the reprogramming is complete, the MIS-1 is ready for
operation.

Table of Contents

Related product manuals