Seismic attachment hardware shown on seismic calculations may differ from hardware supplied
with system. Any additional hardware that is required will be the responsibility of the institution
and/or their contractor. Contact your local GE Installation Program Manager to obtain seismic
calculations.
Seismic calculations are per California Building Code (CBC) and International Building Code
(IBC).
The following shows center-of-gravity information for system components:
•
System Control Cabinet, Illustration 2-69
•
Fluoro UPS UL, Illustration 2-70
•
Fluoro UPS CE, Illustration 2-71
•
PDB UL, Illustration 2-72
•
PDB CE, Illustration 2-73
•
Tube Chiller Coolix 4100, Illustration 2-74
•
Detector Conditioner, Illustration 2-75
•
Omega IV Table, Illustration 2-76
•
Omega V Long Table, Illustration 2-77
•
Gantry, Illustration 2-78
•
19” Desk Mounted Monitor, Illustration 2-79
•
Mavig Overhead Flat Panel Suspension, Illustration 2-80
•
Ergo Overhead Flat Panel Suspension, Illustration 2-81
Optima IGS 320, Optima IGS 330 Pre-Installation Manual
Direction 5537562-1-1EN, Revision 3
Chapter 2 Equipment Requirements 137