EasyManua.ls Logo

GE RSTi-EP - Switch-Off Delay Time; Operation with and Without Test Pulses

GE RSTi-EP
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter3. Configuration
GFK-2956A November 2017 13
4.1 Switch-off Delay Time
The turn-off time of a EP-19xx module is 20 ms, caused by the hardware and firmware delay time.
The time required until the output voltage even of the last switchable module of a safety segment is
below 5 V, can be calculated as follows:
Switch off delay [ms] =
Turn-off time of a EP-19xx module
+ Sum of all modules’ hardware delay
Switch-off Delay and Current Consumption
Module
Hardware Delay (ms)
Current Consumption (mA)
EP-2214
2
8
EP-2614
2
8
EP-2634
3
15
EP-2218
1
15
EP-225F
1
10
EP-5422
5
10
EP-5442
5
10
EP-4164
150
10
EP-4264
150
10
The delay time is always 150 ms, irrespective of the amount of these modules.
4.2 Operation With and Without Test Pulses
All safe power-feed modules provide a test pulse evaluation, so that the highest safety levels can be
achieved (see technical data).
Example of Operation with Test Pulses

Table of Contents

Other manuals for GE RSTi-EP

Related product manuals