Probe Overview
Venue 50 – Basic User Manual 5-17
Direction 5446729-100 English Rev. 7
Planned Maintenance
The following maintenance schedule is suggested for the
system and probes to ensure optimum operation and safety.
Table 5-4: Planned Maintenance Program
Do the Following Daily After Each Use As Necessary
Inspect the Probes X X X
Clean the Probes X X
Disinfect Probes X X