EasyManua.ls Logo

GE Venue 50 - Page 79

GE Venue 50
327 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Positioning/Transporting
Venue 50Basic User Manual 2-23
Direction 5446729-100 English Rev. 7
Cable management
Place probes securely in proper probe holders. Wrap the
probe cables around the probe hooks on sides of the
Docking Cart.
Place the probe connector which is not used in the plastic
shelf.
Wrap the power cord around the power cable hook at the
rear panel of the Docking Cart.
NOTE: If the 3-probe port is attached to the system, please see
“3-probe Port User Instructions” for more information.
Figure 2-22. Cable management
WARNING
To avoid the cables catching on external devices, please
ensure the power cord and probe cables are wrapped properly,
not extended beyond sides of Docking Cart and out of the way
for portables.

Table of Contents

Other manuals for GE Venue 50

Related product manuals