IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
Chapter 3 - System setup 3 - 23
3-5-7 Power On/Boot Up
3-5-7-1 Warnings
NOTE: Do not cycle the Circuit Breaker ON-OFF-ON in less than five (5) seconds. When turning OFF
the Circuit Breaker, the system should de-energize completely before turning the circuit breaker
ON.
3-5-7-2 Power On / Boot Up - detailed procedure
For a detailed procedure, see: 4-2-1 "Power ON/Boot Up" on page 4-4.
3-5-8 Power shut down
For a detailed procedure, see: 4-2-2 "Power shut down" on page 4-8.
ALWAYS CONNECT THE UNIT TO A FIXED POWER SOCKET WHICH HAS THE
PROTECTIVE GROUNDING CONNECTOR.
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS THE
SAFETY GROUND.
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT THE
POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE (WHERE REQUIRED).
SYSTEM REQUIRES ALL COVERS
OPERATE THIS UNIT ONLY WHEN ALL BOARD COVERS AND FRAME PANELS ARE
SECURELY IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION, GOOD SYSTEM
PERFORMANCE AND COOLING PURPOSES.
Use only power supply cords, cables and plugs provided by or designated by GE.