EasyManua.ls Logo

GE Vivid E7

GE Vivid E7
736 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
Chapter 8 - Replacement procedures 8 - 145
8-6-27-2 Remove the Bulkhead Board
Follow these steps to remove the Bulkhead Board:
1.) Disconnect the cables from the Bulkhead Board:
- cable from Main Cable
- cables to left and right speaker
- two short USB cables (Bulkhead Board to OP)
2.) Unscrew and remove two screws.
3.) Remove the Bulkhead Board.
8-6-27-3 Install the Bulkhead Board
Follow these steps to install the Bulkhead Board:
1.) Slide the Bulkhead Board into the correct position.
2.) Install the two screws (M3 x 6, Torque: 1.2 Nm).
3.) Install the cables from the Bulkhead Board:
- two short USB cables (Bulkhead Board to OP)
- cables to left and right speaker
- cable from Main Cable
4.) Install the Upper OP panel and the five rotary knobs.
5.) Connect probe(s) and external cables (network and mains power).
Figure 8-128 Bulkhead Board screws

Table of Contents

Other manuals for GE Vivid E7

Related product manuals