EasyManua.ls Logo

GE Vivid E7

GE Vivid E7
736 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
8 - 212 Section 8-10 - Front End Processor (FEP) / Card Cage parts replacement
NOTE: Even if only one Front Plane Board is replaced, remove both so that the Relay Board and GTX
Board(s) are returned to proper position before installing the Front Plane Board.
4.
Repeat the same also for the RX Board.
5.
Holding the upper and lower edges of the upper Front Plane Board with both hands, rock the upper Front Plane Board
evenly away from the GRLY and RX boards. Be careful not to bend the connector pins.
6.
Repear the previous step for the Lower Front Plane Board.

Table of Contents

Other manuals for GE Vivid E7

Related product manuals