EasyManua.ls Logo

GE Vivid E95

GE Vivid E95
382 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Replacement Procedures
8-28 Vivid E80/E90/E95Service Manual
GC091052
Rev. 3
Rear handle removal
Follow these steps to remove the rear handle:
1. Remove the 2 upper screws, one on each side.
2. Remove the 4 lower screws, two on each side.
Rear handle installation
Follow these steps to install the rear handle:
1. Install the Rear handle in position so its fastening holes are
flush with the holes in the frame.
2. Install the two screws for the rear handle (torque=3Nm).
3. Install the four hex cap screws for the rear handle.
4. Install the top cover.
5. Install the rear cover.
6. Install the side covers.
Verification
Perform the following steps to verify that the product is
functioning as intended after this replacement:
1. Connect cables and probes you removed earlier
2. Power up the Ultrasound system to verify that it operates as
intended.

Table of Contents

Other manuals for GE Vivid E95

Related product manuals