EasyManuals Logo

Gehl RS5-34 Service Manual

Gehl RS5-34
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #74 background imageLoading...
Page #74 background image
RS5-34 Telescopic Handler ELECTRICAL
PRINTED IN U.S.A. 301-16 913241
Template
Name:
OML
_
2
_
col
907871E
Template Date: 1997_02_12
Alt
=
to
hide
template
information
Alt+ to display template information
FUEL SHUT-OFF SOLENOID TEST
STEP 20
G0805165
Install the positive (+) test lead to the fuel shut-off
solenoid. Turn the key switch to the ON position. The
multimeter should read 12 to 13 volts.
If there is no voltage, proceed to the next step.
If there is 12 to 13 volts, but the engine will not start,
replace the fuel shut-off solenoid valve.
STEP 21
G0805166
Check the fuel shut-off solenoid fuse (1) and test
power to the fuse (Step 4) and ignition relay (2)
(Steps 5 and 6).
If the fuel shut-off fuse and ignition relay are
operating properly, repair or replace the red wire
between the fuse and the fuel shut-off solenoid.
1
2
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gehl RS5-34 and is the answer not in the manual?

Gehl RS5-34 Specifications

General IconGeneral
BrandGehl
ModelRS5-34
CategoryConstruction Equipment
LanguageEnglish

Related product manuals